Table formwork system can be lifted with less tie-ins’ and easier to control due to the light weight, therefore makes this system time efficient.


2009 World of Concrete show in Las Vegas.


Formwork and scaffold yard located in Calgary/Alberta


All formwork equipments will be in our custom designed racks, which will make loading and unloading very quick and easy.


Pouring concrete on the second level while re-shoring on the first.


Aluminum safety post is design to be bolted on the end of the I-Beam or drilled down with anchors.

 


Scaffold
Gold Inc.

 Committed to continuous product development of the highest quality.

  • Quality
  • Safety
  • Efficiency
  • Cost Effective

We offer the advantage of a wide range of products. Our aluminum products are interchangeable and compatible with many products on the market today. Additionally, we have manufacturing capabilities to manufacture particular design requirements.

To guarantee the safest line of scaffolding on the market, we meet and exceed all North American standards. We are also a member of SIA, SIAC, ISN Network as well as IS0 9001.

Our Canadian managed and financed factory, Taishan City Scaffold Gold Ltd., specializes in manufacturing scaffolding, aluminum shoring frame systems and formwork systems. Established in 2006, our factory guarantees the highest possible quality standards throughout,  from material purchasing to production. Our Canadian technical expertise and a well trained workforce enable us to produce high quality steel and aluminum products.

We offer the most competitive prices in the market
with excellent customer service.

Slab Formwork System
CEB site
The Slab Formwork System uses the same components that are 
adjustable to different needs, saving time and labor.

 

Add 4 feet edge slab without extra components

Higher loading capacity lifting fork is an easy and cost-effective 
way in moving customized slab to different floor

Slab Formwork System Setup 3